Infill and oversailing SFS
Steel frame systems between and outside the main frame, with 150mm and 250mm studs, twin and back-to-back walls.
Roof-level framing
Parapets, roof-level framing, wind posts and mid-span restraints.
Sheathing and weather line
Cill and head plates, sheathing board and EPDM, ready for the cladding.
We’re currently installing the SFS external envelope on the Les Ozouets Campus in Guernsey for ROK.
<< Back